Hard Hats

Protective Clothing

General Health and SafetyThe list that follows is based upon the Health and Safety at Work Inspectorate’s observations of Isle of Man scaffolding standards.

General Health and Safety

Health & Safety

The list that follows is based upon the Health and Safety at Work Inspectorate’s observations of Isle of Man scaffolding standards.

Whilst it forms the basis of a priority action list, employers are reminded that it is not a full statement of the current legislation.

Falls from height

Falls from Height The fundamental purpose of a scaffold is to allow work at height to be done in safety. Every scaffold that is available for use needs to be able to prevent users falling. Guardrails, toe boards and similar barriers should be provided whenever someone could fall 2 metres or more. These should be strong and rigid enough to prevent people falling to the ground.

The main guardrail must be a least 910mm above platform height. Additional guardrails may be needed required where there is a risk that persons might fall between the main guardrail and the toe board or where persons might fall over the main guardrail (such as a roofer falling from the eaves).

Falls from heightEnsuring that the gap between any gap between any guardrail and toe board is less than 470mm will significantly reduce the risks of persons falling through the edge protection. Guardrails and toe boards are also required at stop ends.

Falling materials

Scaffolds should be constructed to ensure that materials used during construction cannot fall to the ground. Securely fitted toe boards and close boarded platforms form the basis of a good approach to preventing injuries to people working below scaffolds, but unless platforms are kept totally clear of loose materials, there is a risk that materials will be stacked above the height of the toe boards.

In these cases, the safety of people on the ground can be improved by providing barriers such as brick guards or barrier netting. You should note that barrier netting alone is not suitable for use as a fall prevention device. Debris chutes should be used when removing rubbish into a skip, you should cover the skip to stop flying debris and cut down dust.

A bucket and gin wheel or similar device forms a safe way of lowering smaller amounts of debris. Make sure that people are kept out of the way of such operations. Throwing items to the ground is unacceptable.

Working platforms

Working platforms should be wide enough to allow people to pass safely and use any
equipment or material necessary for their work. As a minimum, they must be at least 600mm
wide and free of openings or traps which could cause a tripping or falling accident.

Working PlatformsTimber scaffold boards should meet the standards imposed by the relevant British Standard (BS2482), be in good condition and be fitted with boarding.


Ladders

Any ladder used in conjunction with scaffolding must be in good condition, of sufficient strength and securely located. The top of the ladder should extend at least 1m above the platform level unless alternative safe handholds are provided.

Users of ladders are advised to ensure that any ladders provided are of a suitable standard: domestic access ladders have been known to collapse when used in construction work. Heavy or bulky loads should not be carried up and down ladders: a gin wheel or some form of lifting equipment should be used instead. Makeshift, home made or repaired ladders must never be used. Make sure that anyladder that cannot be safely used is destroyed.

Stability

In the worst case, a scaffold collapse can involve multiple fatalities: at best, it is likely to cause significant disruption. All scaffolds must be based on a firm level foundation capable of supporting the weight of the scaffold and the loads likely to be placed on it. With system scaffolds, it is especially important to ensure that the first lift is properly levelled and located. Base plates are always required at standards and additional boarding will be necessary on weak ground.

All scaffolds need to be braced and tied into a permanent structure, or otherwise adequately stabilised. Ties should be put in place as the scaffold is erected and only removed in stages as the scaffold is struck. If a tie has to be removed to allow work to proceed, an equivalent tie should be placed nearby to maintain stability. Rakers only provide stability when they are braced and footed properly. Ledger and longitudinal bracing should be installed according to the manufacturer’ s rules. Scaffolders will need to be informed of any intention to provide sheeting or for expected concentrated loads and will also need to consider wind loadings when considering the stability of a scaffold being installed.

Loading PlatformsLoading platforms

Scaffolds are not usually designed to support heavy loads on their working platforms. If there is any intention to load out platforms, the scaffolder must be informed in advance. Where concentrated loads are expected, a loading tower structure or heavy-duty scaffold may be required. Any handrails removed to allow loading by lift truck should be promptly replaced.

Safety Netting

Fall arrest nets, usually fixed to steelwork with ropes ensuring no persons can fall through.